6.9 INSTALLING MODULE SUPPORT RAILS
1. Create appropriate rail length by incorporating rail
splice kit. Place splice under rails to be joined and
fasten using 4 M8 bolts (XA52). Hand tighten 5
turns and use a 13 mm socket wrench to tighten to
appropriate torque.
Note: Do not place two 1 in 1 rail splices next to each
other.
Solar module array layout lines
Rail splice
2 in 1 rail
Note location
of slider feet
relative to the
module layout
2. Place rail on standard slider top bracket.
Rail
Standard slider
top bracket
Slider assembly
EAVE
3. Insert M8 bolts (XA52) through dock washer (AD804)
and fasten to standard slider bottom bracket.
0.1” shim
0.4” shim
0.1” shim
0.4” shim
4. Use shim kit to level the height of the rail on the
roof. Place shim between rail and standard slider top
bracket. Slide the shim into the bolt so that it is fully
engaged.
Note: There are two types of leveling shims, 0.1"
(AK113) and 0.4" (AK114). You will need to use bolts of
different lengths, according to the total thickness of
the shims. Refer to the following table.
Total thickness of leveling
shims (inches)
Bolt length
0.
08 to 0.47 M8 x 30
0.4
7 to 0.87 M8 x 40
0.
87 to 1.26 M8 x 50
1.
26 to 1.65 M8 x 60
1.
65 to 2.05 M8 x 70
AK114 0.4" Shims Bolt length
1 M8 x 30
2 M8 x 50
3 M8 x 60
4 M8 x 70
6
INSTALLATION WORK