Specifications

17
<Ver. 2.1>
Installation procedure
2) Procedure for unpacking
1 Remove the PP band.
2 Slowly lift and remove the upper carton.
3 Remove the instruction manual (7 and 8), accessories (9), and stand (2), affixed to the upper pad with tape.
Caution: If the upper pad (3) is removed before first removing these items, the items may fall and damage the
product.
4 Remove the upper pad (3).
5 Remove the corner pad (5).
6 Remove the mirror mat (4).
7 Remove the product. (Requires two workers to remove the set.)
3) Movement after unpacking
Moving the product after unpacking requires two workers.
Never drag the product on the floor.
The display screen (front protective panel) is fragile. Move it slowly, and take care to avoid striking it or scraping
objects against it.
Remove the protective film applied to the front protective panel only after construction and work are finished
and dust has settled.