Specifications

Installation TDB3108, WF3208
Bradley • 215-1187 Rev. P; ECN 13-00-001 4/30/2013 11
4a
Adaptive Infrared Assembly for A Drain and O Drain Units
without Tie Pipe Option
A
Install hemmed end (not sharp end) of
support tube with gasket onto bowl.
B
Connect 1/2" supply tubing to sprayhead with
3/8" NPT to 1/2" tube connector and place
sprayhead onto support tube. Run the tubing
down through the support tube and connect
to valve tube connector.
C
Place the upper tie bar (notched at both
corners of each end) on top of sprayhead.
Connect the longer tie rod to the 4-1/4" tie
rod using the coupling nut with hex head
set screws. Run the tie rod assembly down
through upper tie bar and secure from
underneath the bowl using lower tie bar (no
notches) and hex nut with socket head set
screw.
Tie Rod Pre-Pack
Cover
Actuator
Module
Assembly
Coupling
Nut
Sprayhead
Tie Bar
Tie Rod
Supply Tube
Section View of
A/O Unit Assembly
Tie Rod Pre-Pack
(S45-1336)
Top Cover
(107-099 (A))
(107-179 (O))
Module Cover
(S04-083)
Sprayhead
(S05-054)
Drain
(S45-273)
Terreon
®
Deep Bowl (ADA bowl shown,
classic bowl is optional) (Part No. Varies
with color of bowl. Contact your local
Bradley Rep for assistance)
Access Panel
(186-1456)
Pedestal Assembly
(S17-242)
1/2" Supply Tube
Support
Tube Gasket
(125-011)
Support Tube
STD (S57-005)
JUV (S57-006)
Tie Bar
I.R. Module Assembly
(S50-344)
Nut
Tie Rod
(176-008A)
Valve Assembly
(S50-369)
Pre-Pack
(S45-055)
A/O
(A Shown)