Specifications
TDB3108, WF3208 Installation
12 4/30/2013 Bradley • 215-1187 Rev. P; ECN 13-00-001
4a
Adaptive Infrared Assembly for A Drain and O Drain Units
without Tie Pipe Option continued...
D
Place the infrared module assembly on top of
sprayhead. Rotate until infrared module locks in
with tie bar. Drop two infrared module wires down
to valve assembly.
Skip to step F for units without soap.
E
For units with soap option, install the spacer, soap
dispenser and cover using the third tie rod (8-5/8"
long) and second coupling nut as shown. Secure
with acorn nut and set screw.
F
Secure infrared module cover and top cover with
acorn nut and set screw.
G
For O Unit: Install 1/2" nominal copper tubing
supply lines (pass them through holes in cover
down through support column) and connect to
stops using suitable fittings.
Unit with "A" Drain and I.R. Module
Shown, Also Available with "O" Drain
Top
Cover
Soap
Dispenser
8-5/8" Tie Rod
Spacer
Coupling
Nut
Module
Cover
4-1/4" Tie Rod
I.R. Module
Assembly
(S50-344)
Coupling
Nut
Tie Bar
Sprayhead
(S05-054)
Support Tube
STD (S57-005)
JUV (S57-006)
Tie Rod
(STD) 21-5/8"
(JUV) 18-1/8"










