Specifications
Installation TDB3108, WF3208
Bradley • 215-1187 Rev. P; ECN 13-00-001 4/30/2013 15
5
Valve and tubing connections
Flush supply lines before making connections.
Do not apply pipe sealant to compression fittings.
A
Connect 1/2" dia. tubing to tee and solenoid
assembly, two places. The male connector
for the valve assembly will remain tight and
leakproof when tubing is cut and installed
properly. Follow the procedures below when
installing tubing to ensure that you achieve a
leakproof seal.
• Using a sharp razor, cut tubing squarely
and remove any burrs. DO NOT pinch or
crush end of tubing.
• Loosen nut on fitting. Moisten end of tube
and push into fitting until it is firmly seated.
Tighten nut to secure tube to fitting (make
sure nut is securely tightened).
• If connector leaks, reseat tubing according
to above procedure. If leaking persists,
replace male connector, or call your
Bradley representative for assistance.
B
C
Hang valve assembly on pedestal bracket.
Use wire tie to secure valves.
Connect the 1/2" NPT female end of the
stop/check valves to the rough-ins.
D
Attach flexible hosing to thermostatic mixing
valve, two places.
E
Insert the filter washers (provided) into the
swivel nut at the end of the supply hoses and
connect to the stop/check valves.
Volume Control
(S02-045)
Thermostatic
Mixing Valve
Assembly
(S67-597)
Flexible
Hose
Solenoid
Assembly
(S08-055)
1/2" Dia. Tube
(R68-600012)
1/2" Dia. Tube
from Sprayhead
Tubing
Male Tube
Connector
Nut
Pedestal
Filter
Washer
Cold Supply
Hot Supply
Check/Stop
Valve
Volume
Control
Valve Bracket
1/2" Tube from
Sprayhead
For “O” and “B” units (overhead
supplies) skip steps C through E.
Tee
(269-764)
Filter
Washer
Stop/Check
Valve










