Specifications
TDB3108, WF3208 Installation
6 4/30/2013 Bradley • 215-1187 Rev. P; ECN 13-00-001
(mm)
Rough-In Specifications
Type A
Off-line vent with
supplies from below
7-5/8"
(194)
4"
(102)
2-1/2"
(64)
1/2" NPT Supplies Through Floor:
Stub Up 2-1/2" (64) Above Floor
Cold
Hot
4"
(102)
2" NPT Drain,
Stub Up 3" (76)
Above Floor
Suggested
Electrical Outlet
Location
54" (1372) Bowl
7-5/8"
(194)
Type B
Centrally rising vent with
supplies from above
1" NPT Supplies From Above
Must Reduce to 1/2" Nom. Copper
Tube on These Centers To Pass
Thru Washfountain
7/8"
(22)
7/8"
(22)
Hot
1-1/2" NPT
Vent to Ceiling
1-1/4"
(32)
4"
(102)
Suggested
Electrical Outlet
Location
4"
(102)
2" NPT Drain,
Stub Up 3" (76)
Above Floor
54" (1372) Bowl
Cold
Supply lines for one to two
washfountains should be 1"; for
three washfountains, 1-1/4". For
more than three washfountains,
pipe sizes should be increased
proportionately.
Supply lines for one to two
washfountains should be
1"; for three washfountains,
1-1/4". For more than
three washfountains, pipe
sizes should be increased
proportionately.










