Technical data

13773-001
24-30
Page 1130 Nov 2000
D. Low-Volts Warning Light (Annunciator Panel)
(1) Removal - (Refer to 31-50)
(2) Installation - (Refer to 31-50)
E. ALT 1 and ALT 2 Fail Lights (Annunciator Panel)
(1) Removal - ALT 1 and ALT 2 Fail Lights
(a) Verify the ignition switch is in the off position and remove the key. (Refer to POH)
(b) Ensure BAT 1, BAT 2, and AVIONICS master switches are in the off position.
(c) Pull BAT 2 circuit breaker to the off position.
(d) Remove the engine cowling. (Refer to 71-10)
(e) Disconnect primary battery and insulate battery terminals to prevent accidental connec-
tion. (Refer to 24-30)
(f) Remove the MFD.
(g) Identify the location of the ALT 1 and ALT 2 Fail Lights.
(h) Identify all wires to the ALT 1 and ALT 2 Fail Lights wire harness.
(i) Remove the nut rings securing the ALT 1 and ALT 2 Fail Lights to the instrument panel.
(j) Identify and disconnect all wires from the solder joints of the ALT 1 and ALT 2 Fail Lights
wire harness. Remove the lights.
(2) Installation - ALT 1 and ALT 2 Fail Lights
(a) Identify the corresponding wires and place heat shrink tubing into position.
(b) Identify, connect and solder all wires to the ALT 1 and ALT 2 Fail Lights wire harness.
(c) Secure the ALT 1 and ALT 2 Fail Lights to the appropriate hole in the instrument panel
using the existing nut rings.
(d) Install MFD.
(e) Connect the primary battery.
(f) Install and secure the engine cowling.
F. Volt / Amp Meter
(1) Removal - Volt / Amp Meter
(a) Verify the ignition switch is in the off position and remove the key. (Refer to POH)
(b) Ensure BAT 1, BAT 2, and AVIONICS master switches are in the off position.
(c) Pull BAT 2 circuit breaker to the off position.
(d) Remove the engine cowling. (Refer to 71-10)
(e) Disconnect primary battery and insulate battery terminals to prevent accidental connec-
tion. (Refer to 24-30)
(f) Remove the MFD.
(g) Remove the screws and washers securing the Volt / Amp Meter to the instrument panel.
(h) Identify and disconnect all wires from the Volt / Amp Meter.
(i) Remove the Volt / Amp Meter.
(2) Installation - Volt / Amp Meter
(a) Identify and connect all wires to the Volt / Amp Meter.
(b) Secure the Volt / Amp Meter to instrument panel using the existing screws and washers.
(c) Install MFD.
(d) Connect the primary battery.
(e) Install and secure the engine cowling.