Technical data

13773-001
27-30
Page 530 Nov 2000
1
the empennage elevator actuation pulley stops contact before secondary stops,
2
secondary stops mounted on either control yoke assemblies show a 0.035 inch +/-
0.020 (0.89 mm +/- 0.51 mm) gap between stop and yoke bearing mount.
(o) Verify trim cartridge minimum rod end thread engagement of 0.312 inch (0.79 cm).
Tighten jam nuts.
(p) Perform Pitch Trim Inspection/Check. (Refer to 27-30)
(q) Remove inclinometer.
(r) Remove clamp holding control yoke to neutral pitch position.
(s) Install kick plate. (Refer to 25-10)
(t) Install access panels RE1 and RE2.(Refer to 6-00)
(u) Install baggage compartment carpet and access panel CF5. (Refer to 6-00)