Technical data

13773-001
51-30
Page 12 30 Nov 2000
(g) Mix and apply top coat per manufacturer's instructions. Allow to fully cure.
(3) Post Painting Instructions
The following components should be installed back onto the airplane: oil access door, lower
engine cowling access panel, upper engine cowling, lower engine cowling, wing tip fairings,
antenna components, and landing gear fairings.
(a) Remove masking tape within the paint manufactures specified removal time.
CAUTION: All masking tape must be removed from doors, door locks, cabin door han-
dle, door pins (stainless), plastic door jamb pin receivers, landing gear,
engine, propeller/spinner, access panel flanges, threads of VOR antenna,
rudder actuation push-pull tube, bearings on lower vertical stabilizer hinge
(rudder), aileron hinges, rod end bearings on flap actuation link, rod end on
aileron actuation arm, data plate, camlocks, hinges, lower engine cowling
access panel, oil access door, outside air temperature (OAT) probe, fuel
vents, fuel caps, static ports, interior surfaces of access panels, sealant
region between window and door skin, flexible plastic fairing on nose land-
ing gear slot, pitot tube, exterior surface of the windows, and all antennas.
(b) Install all exterior access panels. (Refer to 6-00)
(c) Install anti-collision strobe light assemblies to the wing tip fairings. (Refer to 33-40)
(d) Install wing tip fairings and landing gear fairings. (Refer to 57-20), (Refer to 32-10)
(e) Install lower engine cowling access panel.
(f) Install oil access door.
(g) Install upper and lower engine cowlings. (Refer to 71-10)
(h) Install VOR antenna wicks and rubber grommets.
(i) Install interior trim onto baggage door. Install baggage door. (Refer to 52-30)
(j) Install interior trim onto cabin doors. Install cabin doors. (Refer to 52-10)
Note: Make sure all masking tape and alike has been removed from the airplane
and its components.
(k) Apply all placards. (Refer to 11-00)
(l) Balance flight controls. (Refer to 55-00)
(m) Verify all flight controls for proper operation.
(n) Verify all electronics for proper operation.