Operating instructions

NOTE: Read the entire instruction manual before starting the
installation.
This symbol indicates a change since the last issue.
Index Page
DIMENSIONAL DRAWING........................................................2
SAFETY CONSIDERATIONS.....................................................3
Clearances to Combustibles......................................................3
ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS ....3-4
INTRODUCTION..........................................................................4
APPLICATIONS ......................................................................4-11
General ......................................................................................4
Upflow Applications..............................................................4-6
Downflow Applications.........................................................7-8
Horizontal Left (Supply-Air Discharge) Applications .........8-9
Horizontal Right (Supply-Air Discharge) Applications.....9-11
LOCATION ............................................................................11-12
General...............................................................................11-12
Furnace Location Relative to Cooling Equipment ................12
Hazardous Locations...............................................................12
INSTALLATION....................................................................13-16
Leveling Legs (If Desired).....................................................13
Installation On a Concrete Slab .............................................13
Installation On a Combustible Floor (Downflow
Applications) ................................................................13-14
Installation In Horizontal Applications..................................14
Filter Arrangement..................................................................15
Bottom Closure Panel.............................................................15
Gas Piping...............................................................................16
ELECTRICAL CONNECTIONS...........................................16-19
115-v Wiring......................................................................16-17
24-v Wiring.............................................................................17
Accessories..............................................................................19
DIRECT VENTING ...............................................................20-28
Removal of Existing Furnaces from
Common Vent Systems.....................................................20
Combustion-Air and Vent Piping .....................................20-25
Concentric Vent and Combustion-Air Termination
Kit Installation..............................................................25-28
Multiventing and Vent Termination.......................................28
CONDENSATE DRAIN ........................................................28-30
General ....................................................................................28
Application..............................................................................28
Condensate Drain Protection.............................................28-30
SEQUENCE OF OPERATION..............................................30-31
Heating Mode..........................................................................30
Cooling Mode .........................................................................30
Continuous Blower Mode.......................................................30
Heat Pump Mode...............................................................30-31
Component Test......................................................................31
START-UP PROCEDURES ..................................................31-37
General ....................................................................................31
Prime Condensate Trap With Water......................................32
Purge Gas Lines......................................................................32
Adjustments .......................................................................32-37
Set Gas Input Rate ............................................................32-36
Set Temperature Rise ........................................................36-37
Blower Off Delay (Heat Mode).............................................37
Set Thermostat Heat Anticipator............................................37
CHECK SAFETY CONTROLS..................................................37
Check Primary Limit Control.................................................37
Check Pressure Switch ...........................................................37
CHECKLIST...........................................................................37-38
A93040
®
ama
CANADIAN GAS ASSOCIATION
APPROVED
R
As an ENERGY STAR
SM
Partner, BDP Company
has determined that this
product meets the EN-
ERGY STAR guidelines
for energy efficiency.
CERTIFICATION OF MANUFACTURING SITE
Fig. 1—Multipoise Orientations
A93041
UPFLOW
DOWNFLOW
HORIZONTAL
LEFT
AIRFLOW
AIRFLOW
AIRFLOW
AIRFLOW
HORIZONTAL
RIGHT
installation, start-up,
and operating instructions
4-WAY MULTIPOISE
FIXED-CAPACITY DIRECT-VENT
CONDENSING GAS FURNACE
Cancels: II 340M-40-2 II 340M-40-3
5-96
340MAV
Series D
—1—

Summary of content (40 pages)