Operating instructions

- 34 -
EBA 480 EP
480E
P
D
Maintenance work may only be performed by
trained staff.
Danger! Disconnect the mains before
starting any service work or before removing
the cover.
Grease the backgauge (A) control weekly with
a grease gun. Advance the backgauge as far
as possible to the front. (Use non-resinous oil
or grease).
Grease the remaining parts twice a year (see
picture).
The main switch must be on "0" (B).
Remove lower panel (C). Tools in tool set.
Remove any paper.
Grease the machine.
Check the 4 joining bolts and 2 pushing bars
for wear (D). If necessary inform your service
personnel.
Mount the machine.
Maintenance and cleaning
= Greasing points on the machine