Specifications

Loveland Fire/Rescue
Pumper
Production Specification
SVI #769 Page 117 of 125 June 17, 2010
..\4) Pricing & Change Orders\Production Change Order.pdf
BOOSTER REEL HOSE GUIDE ROLLERS
The Hannay booster reel shall be equipped with one (1) set(s) of FH-3 hose guide rollers.
A clip type mounting bracket shall be provided in the reel compartment to hold a booster nozzle.
At the corners of the compartment near the booster hose reel provide vertically installed heavy duty, stainless steel rollers
to provide easy hose movement around the apparatus. (4 total)
BOOSTER REEL HOSE
Two (2) 100' x 1" section(s) of Neidner "ReelTex" booster hose coupled with 1" NST Pyrolite coupling shall be provided on
the specified booster reel.
SIDE MOUNT PUMP ENCLOSURE
The side mount pump enclosure shall be removable and supported from the chassis frame rails. This enclosure will allow
independent flexing of the pump enclosure from the body and allow for quick removal. The support structure shall be
constructed of extruded aluminum tubing and angle.
All pump suction and discharge controls are to be mounted on the driver side pump operator's panel so as to permit
operation of the pump from a central location. The fire pump, valves and controls shall be accessible for service and
maintenance as required by applicable sections of NFPA standards.
The "master" gauges shall be suitably enclosed and mounted on a full pump compartment width "hinged" gauge panel
constructed of the same material as the pump operators control panel, allowing access to the backside of all gauges and
gauge lines. The individual gauges shall be mounted inline with the control handle or adjacent to the control handle. Panel
is to include a stainless steel piano hinge, flush mounted chrome plated trigger latch, and stainless steel cable end stops.
Electrical wiring and all gauge lines shall be properly tie wrapped to prevent kinking or cutting of the lines when the panel
is opened.
The following controls and equipment shall be provided on the pump panel or within the pump enclosure:
1) Electric primer.
2) Pump and plumbing area service lights.
3) Pressure control device and throttle control.
4) Fire pump and engine instruments.
5) Pump intakes and discharge controls.
6) Master intake and discharge gauges.
7) Tank fill control.
8) Tank suction control.
9) Water tank level gauge.
10) Pump panel lights.
LEFT SIDE RUNNING BOARD - SIDE MOUNT PANEL
The left side mount pump panel shall be equipped with side running board. The running board will extend along the width
of the pump enclosure from the forward end of the body module to behind the chassis cab.
The running board shall be constructed of aluminum tread plate, bolted in place with stainless steel fasteners. The step
surfaces shall be in compliance to applicable sections of NFPA requirements.