Specifications

ProtoMat 95s/II
Manual
17
3 Setup
3.1
Before switching on
Caution
You must ensure that the voltage set on the machine corresponds with the
mains line voltage before switching on. If not, see the section headed
Setting the device voltage, electrical fuses.
Remove all objects from the plotter and its traverse range before switching on. Pilot pins
must not be projecting from the board material.
Caution
Carefully close the hood.
Never reach into the machine while it is running.
Never move the plotter head manually. Doing so could damage the
electronics.
3.2 Switch-on sequence
It is absolutely vital that you follow the switch-on sequence to guarantee trouble-free
use of the ProtoMat 95s/II.
The circuit board plotter must be switched on and the initialization run completed before
BoardMaster is started. Otherwise it will not be possible to execute the communication
operations that occur as soon as BoardMaster is started.
1.
Computer
2.
LPKF ProtoMat 95s/II
3.
Start the BoardMaster program
The following screen will appear when the program is started:
The Tool Status dialogue box
You must determine where any tool is located when the machine is switched on.
Next the vacant tool position in the tool magazine must be specified.
Comment: Position 1 = tool 1 is positioned extreme right,
Position 30 = tool 30 is therefore positioned extreme left in the tool magazine.