Specifications

ProtoMat 95s/II
Manual
27
6.
Right-click on the project.
The
P
LACEMENT
dialogue box opens. Specify the position in the
O
RIGIN POINT
box as x=0, y=0 and confirm by clicking on .
7.
Select the
D
RILLING
P
LATED
process from the production phase list box.
8.
Click on
and enclose the first hole by clicking and dragging with the left
mouse button.
9.
Now enable the selected hole for machining by clicking
and
. The hole is drilled in the board once the tool has been changed for the
specified drill.
10.
Next move to the PAUSE position and rotate the board about the x-axis.
11.
Now select the
M
ILLING
T
OP
process from the production phase list box.
12.
Click on
once again and enclose the milling track corresponding to the first
hole by clicking and dragging with the left mouse button.
13.
Now enable the milling track for machining by clicking
and .
The software again changes automatically the specified tool and mills a circular track.
Check the settings, including the milling pass width and the milling depth setting before
you start machining.