RK56S27F, RK56S30F Installation Manual
6
FLUSH INSTALLATION INSTRUCTIONS
4. BACK FRAME INSTALLATION: Position BACK FRAME
equal space top to bottom, side to side. Mark for 4 holes
on the installed wood cleats, center punch and pre-drill
with
1
⁄16” drill bit. Secure frame with 4 SCREWS E. See
Figure 7.
Equal gap top, bottom
Equal gap
side to side
Mounting holes
Mounting holes
Mounting holes
Mounting holes
Screw E
Screw E
Screw E
Screw E
Figure 7
5. Install Air Deectors top and bottom. Center (left and right)
the Air Deectors above and below the installed BACK
FRAME. Secure AIR DEFLECTORS with 4 SCREWS E.
See Figure 8. Mark holes and pre-drill the wood cleats
with
1
⁄16” drill bit.
Figure 8
6. FRONT FRAME INSTALLATION: Place the FRONT
FRAME onto the BACK FRAME and align ball studs
and receivers. Secure the FRONT FRAME to the BACK
FRAME by rmly pushing the FRONT FRAME onto the
BACK FRAME engaging the 4 snap attachments. See
Figures 9-10.
Snap
attachment
Figure 9
Figure 10