Specifications

5. PREVENTIVE MAINTENANCE SCHEDULE
After performing preventive maintenance, do the following:
1. Set the lamp voltage with SP Mode No. 48. Make a copy of the O-S-A3
test chart at manual image density level 4 to confirm that the lamp voltage
is set correctly. (See Exposure Lamp Voltage Adjustment.)
2. Select SP Mode No.56 and set the ADS to 2.5 ± 0.1V by turning VR101.
3. Select SP Mode No.54 and set Vsg to 4.0 ± 0.2V by turning VR102.
4. Make a sample copy.
NOTE: 1) Drum Initial Setting (SP#66) must be done after the drum is
replaced.
2) Black Developer Initial Setting (SP#65) must be done after black
developer is replaced.
3) Color Developer Initial Setting (SP#10) must be done after color
developer is replaced.
1 December 1990
4-39