Service manual

VL-NZ50U/NZ100U
VL-NZ150U
19
9-3. How to operate with the circuit board without the cassette controller assembly.
In this method, if the procedure is followed incorrectly there is danger of damaging the mechanism and the tape, so except in special
cases, such as when measuring the VSR torque, do not perform this procedure. Normally operate this unit with the cassette controller
assembly attached.
Be sure to follow each caution mentioned.
Phase matching hole
(for chassis)
Main cam
Coupling
gear
Phase matching
mark
Fig. 8
Fig. 9
Mode switch
Sub cam
(1) Apply DC3 ~ 4V to the loading motor to enter the standby mode.
(2) Securely press the movable piece
L
of the down SW with
cellophane tape or similar to turn on SW. (Take care that the
movable piece turns only in the shown arrow direction.)
Note: To enter REC mode, press the pin of the recognition switch
M
.
(Unnecessary in other modes.)
(3) Set the test mode (T-01) with the adjustment remote controller
without putting the tape, and the mechanical operation will
become possible with the mode key.
(4) For ejection, remove the tape of (2).
Fig. 7. LOADING START mode
Rotary di-
rection of
movable
piece
Movable piece
of down SW.
Side view
9-4. Phase matching
Referring to Figs. 8 and 9, align the phase for the following parts.
(1) Eject lever (2) Eject control lever (3) Mode SW (4) Main cam (5) Sub cam
Note: Before disassembly, sufficiently check the marker position.
Note: When installing the joining gears, verify that the phase matching holes of the main cam and subcam are aligned to the hole of
the chassis.
Note: After the phase is aligned, turn the mode SW with hand, and verify that it turns nearly one turn.
(After verification, return it to the original position.)
Phase matching hole
(for chassis)
Eject lever
Phase matching hole
(for gear)
Eject
control lever
Phase matching hole
(for chassis)