User manual

Installation Procedures
BioRobot EZ1 DSP Workstation User Manual 02/2007 4-1
4 Installation Procedures
The BioRobot EZ1 DSP is a plug-and-play instrument,
making unpacking and installation easy. A member of your
group who is familiar with laboratory equipment should
oversee the installation.
4.1 Requirements
Site
The BioRobot EZ1 DSP must be located out of direct sunlight,
away from heat sources, and away from sources of vibration
and electrical interference. Refer to Appendix A for the
operating conditions (temperature and humidity).
Use a level workbench that is large and strong enough to
accommodate the BioRobot EZ1 DSP. Refer to Appendix A
for the weight and dimensions of the BioRobot EZ1 DSP.
The BioRobot EZ1 DSP must be placed near to a properly
grounded (earthed) AC power outlet. The power line to the
instrument should be voltage regulated and surge protected.
4.2 AC power connection
Power requirements
The BioRobot EZ1 DSP operates at:
200–240 V AC ± 10%, 50/60 Hz, 300 VA
100–120 V AC ± 10%, 50/60 Hz, 300 VA
Make sure the voltage rating of the BioRobot EZ1 DSP is
compatible with the AC voltage available at the installation
site.
Grounding requirements
To protect operating personnel, the BioRobot EZ1 DSP must
be correctly grounded (earthed). The workstation is equipped
with a 3-conductor AC power cord that, when connected to
an appropriate AC power outlet, grounds (earths) the