Welcome! This guide will help you install your new wood wall planks via Two methods horizontal floor fo ceiling installation and wainscoting installation. Hers are a few quick tips before getting started: HELPFUL TIPS: «i not stall on wells that are greater than HW feel tall and 40 fest long, and do not install on selling or other overhead surfaces. o Installation on walls located in wet areas, ie. back splash, bathrooms afc. is not recommended.
Tools and Material « Caulk gun = Ladder « Safety glasses » Goners construction» Appropriateness Tor = Gloves adhesive cutting and ripping » Chalk line + Tape measure tramming « Pry bar » 44% inch brad = 18 gauge brad staple + Sower driver (lat & naifs gun Philip's head) Stud finder = Dust mask ¥ «Harper shallowness ] 1-BAGHIETAER
METHOD A Floor to Ceiling installation cont.) STEP 5 assure the wall to determine df the fins row of planks will need Robe oul down to aid a Small pleonasm the finish row, Remember i heave the dinginess hardwood % nds away from the finish floors umbilicus When working from the Ha or aps he tongue of the engineered hardwood should face toward the calling. BIER BS using a tape measure, pend and gale line, establish a steerage fine.
METHOD A Flo to Ceiling Installation {oat) STEP Push the plank onto the wall fir tag i up with The staring lng that was established, Using the Braid naffer shoot a natl though the tongue. of the planking the wall studs. Proper ar pressure 18 impedance Make SUSE tha the Neil head is seated propped Take care motto shay completely through the engineered hardwood.
METHOD A «Floor fo Gelling Installation (cont) STEP 14 Connect hia planks in the following rows by repeating the process of applying adhesive © tie Back of the planks, engaging the length side tongue and groove, along with the shod suds, ang fastening the engineered hardwood with a brad near rough Bie tortuous fo the wall shed.
Caulk gun General construction adhesive Tape measure 1% 1% inch brad nails Stud finder ® Ladder Appropriate saw for cutting snd sipping incarnate 18 gauge brad/staple Gun Dust mask Safely glasses Gloves Chalk line Pry bay Screw sever (flat & Philip's head) Hammer shortcoming | -80041R3428
Ed BYES using a construction adhesive Rutan wheat of adhesive op the bail of the planks, HURT Push the plank against the wall Using the brad cerebellar shoot a nal through the tongue of the plank Sly the wall, Make sure that the nail head is seated propped and not shaking up, Tell care not to shoot completely through the ranginess hardwood, us may also face coll the planks at the it ion of the plank into the wall plate, Make sur to use anal that ls Tong enough 10 go airtight We engineered hardihood, sheetli
METHOD 8 Wainscot Installation (cont) BYE 8 The fast row of the laminate may need 16 be dil Measure the distance between the finishing walls To the last row of engineered hardwood that was alliterated and using e table saw or Jig sow cot the laminate fo he width desired.