Instructions / Assembly

9
shawfloors.com
|
1-800-4
11-
7
429
METHOD B -
Wainscot Installation
(
c
ont.)
STEP
1
Remove existing baseboards
on the wall
that will
be
receiving
the
engineered hardwood
.
STEP
2
Make sure
to
turn off the
power supply while
working around exposed power outlets
or
light
s
wit
ches.
Remove
any
electrical outlet
and
light
s
wit
ch
covers. Take care not to
t
ouch
any
exposed
wiring.
STEP
3
Mark all studs using a stud finder
and then using a
chalk line
from top to bottom,
mark the
s
tuds.
STEP
4
Measure
to determine
the
desired length
of
the
planks. Make sure
to
allow for
a ½
e
xpansion
between
the
floor
and the
engineered
hardwood
.