Installation Guide

WARNING:SKIMCOATINGOVEROLDADHESIVEISNOTRECOMMENDED.THEADHESIVEMAYBREAKDOWNANDCOULDLEADTOFAILURE.THE
OLDADHESIVEMAYNOTALLOWTHERESILIENTFLOORINGTORETAINITSDIMENSIONALSTABILITY,POSSIBLYLEADINGTOUNNECESSARY
INDENTATIONS.SOMESOLVENTBASED‘CUTBACK’ASPHALTBASEDADHESIVESMAYCONTAINASBESTOSFIBERSTHAT
ARENOTREADILY
IDENTIFIABLE.DONOTUSEPOWERDEVICES,WHICHCANCREATEASBESTOSDUSTINREMOVINGTHESEADHESIVES.THEINHALATIONOF
ASBESTOSDUSTMAYCAUSEASBESTOSISOROTHERSERIOUSBODILYHARM.
4.SHAWADHESIVES&PRIMER
Refertoadhesivelabelforpropertrowelrequirements,spreadratesandapplication.
Priortoapplicationofadhesivedetermineifthesubstrateisaporousornonporoussubstrate.Followinstructionsontheadhesivelabelforporous
ornonporoussubfloor.
IMPORTANT:Recommendedtoperformabondtestinordertodetermineadhesiveworkingtimeperjobsiteconditions.Thestrengthofthe
bondtest
willindicatewhetherShaw9050floorprimerisnecessary.
5.INSTALLINGRESILIENTTILE&PLANKPRODUCTS
General:
a. Ensurethatmoisturetestshavebeenconductedandthattheresultsdonotexceedtheacceptablemoisturelimitfortheadhesiveused.
b. PHofconcretesubfloorneedstobebetween5&9.
c. ThepermanentHVACsystemisturnedonandsettoaminimumof65°F(20°C))oramaximumof85°F,foraminimumof72hoursprior
to,duringandafterinstallation.Aftertheinstallations,themaximumtemperatureshouldnotexceed85°F.
d. Donotstackmorethan
5cartonshigh.
e. Flooringmaterialandadhesivemustbeacclimatedtotheinstallationareaforaminimumof48hourspriortoinstallation.
f. UseappropriatetrowelsizeregardingsubstrateporosityunlessusingS150SprayAdhesivewherenotrowelisrequired.
g. Materialshouldalwaysbevisuallyinspectedpriorto
installation.Anymaterialinstalledwithvisualdefectswillnotbeconsidereda
legitimateclaimasitpertainstolaborcost.
h. Installtilesrunninginsamedirection.
i. Ensurethatallrecommendationsforsubfloorandjobsiteconditionsaremetpriortobeginning theinstallation.Directionaldesignsare
optional,however,
oncetheinstallationisstarted,youhaveacceptedthoseconditions.
LAYOUTANDINSTALLATIONGENERALRULES:
a. Shawtileandplank‐Installusingconventionaltileandplankinstallationtechniques.Plankproductsshouldhaveaminimumof68"
seamstagger.
b. Carefullydeterminewheretobegintileorplankinstallation.
c. Itiscustomarytocenterroomsandhallwayssobordersarenotlessthanhalfatileorplank.
d. Workingoutofmultipleboxes atatimeisrecommended.
e. Inhallwaysand smallspaces,itmaybesimplertoworklengthwisefromoneendusingacenterreference
lineasaguide.
f. Makesurecutedgesarealwaysagainstthewall.
g. ToproperlycutLVT/LVPproductsscorethetopsideofthematerialwithautilityknife.Bendtheproductandfinishthecutthroughthe
backside.Thiswillensurethecleanestcut.Itmaybe
necessarytouseaheatguntocutaroundverticalobstructions.Allowtheheated
LVT/LVPtoreturntoroomtemperaturebeforeinstallation.
h. Cuttingtheproductintoafinepointmayleadtodelamination. UseanethylcyanoacrylatebasedsupergluetohelpfusetheLVT/LVP
pointtogether.Besureto
cleanallgluefromthetopsurfaceimmediately.Alcoholbasedsupergluesmaycausevinyltoswell.
NOTE:Recommendedtousefloorprotectionafterinstallation.DONOTuseaplasticadhesivebasedprotectionsystem.
INSTALLATIONFORTILE:
LayoutoftheRoomforSquarelyLaidFields
Tosquaretheareato
becovered,firstfindthecenterofoneendofthemainrectangle.Locatethesamepointatthe
otherendwall.Snapachalklinebetweenthesepointstomarkthecenterlineonthefloor.Thenmeasurealongthis
centerlinetofindthemiddle oftheroom.
Atthecenterpoint,markoffalineacrossthe roomatexactlyrightangles
tothefirstline.Thismaybeaccomplishedbythe345‐trianglemethodasshowninFigure 1 .Thenmeasure4feet
towardeachsidewallfromthecenterpoint.Thenmeasure3
feetfromthecenterpointalong thelongerline,
measureexactly5feetfromthe3footmarkonthecenterlinetothe4footmarkonthecrossline.Ifthe5foot
Fi
g
ure1