Installation Guide
cut a small sliver of flooring to place along the wall.
Layout of the Plank:
a. Carefully place the first piece of plank at the junction of the chalk lines.
b. Continue to lay the plank, making sure each plank flush against the chalk line and tight against the adjoining plank.
c. Make sure the plank is well seated into the adhesive paying
special attention, to the edges. Lay row by row, or in a pyramid fashion
as shown below.
Fitting the Border:
a. Measure the distance from the last plank in the row to the wall.
b. Mark the plank and cut it against the mark.
c. Lay the plank in place, making sure that the cut edge is against the wall.
Fitting Around Irregular Objects:
a. Make a pattern out of heavy paper to fit around pipes and other irregularities.
b. Place the pattern on the plank, trace cutting along the trace lines.
IMPORTANT: All flooring must be rolled with a minimum 100-lb roller after installation. Use a hand roller in areas not reached with a 100-lb.
roller.
7. LIMITED WARRANTY
For complete warranty information, please call – Shaw Information Center: 1 800.441.7429
Shaw Industries Group, Inc., a Berkshire Hathaway Company. Revised JT 04162019
For reference purposes only if printed or downloaded.