INSTALLATION INSTRUCTIONS This is an interactive PDF, click on the rectangular buttons or blue text to jump to the sections. Easy-to-follow instructions for the handy DIYer. SIMPLE Start to finish, everything you need to know to install your Matrix floor like a professional.
INSTALLATION 101 THE PREP 1. Store and install Matrix flooring in a climate controlled location with a temperature range between 55°–85°F (13°–29°C). If product is stored in temperatures outside this range, acclimate the product for 48 hours prior to installation 2. Inspect Subfloor (See Step 1) 3. Inspect planks for damage before installing. 4. To minimize shade variation, mix and install planks from several cartons.
4. Use several spacers to maintain a 1/4" expansion gap along the walls. 3. 5. Lock the short ends together to complete your first row. Cut the planks as needed to fit the space. 6. Start your second row. With a cut-off that is more than 8" long (20cm) or start with a new plank. 7. Insert the long side tongue into the groove of the plank in the first row at a low angle and rotate down. 8. Second plank, second row: Insert the short end tongue into the previously installed plank groove. 9.
11. Protect all exposed edges of the flooring by installing wall molding and/or transition strips. 12. Protect the finished flooring from exposure to direct sunlight to reduce fading and thermal expansion. 13. For door jambs, a flat pull bar may be used to assist in locking the planks. For irregular spaces, cut planks cleanly with a utility knife. You can use a cardboard template of the area to transfer pattern to the plank. 14. Enjoy your new floor! EXCLUSIVELY AT LOWE’S® LEARN MORE AT LOWES.
Installation RESILIENT INSTALLATION GUIDELINES FOR HYBRID LVT PRODUCTS I. GENERAL INFORMATION All instructions and recommendations should be followed for a satisfactory installation. Acclimation of material prior to installation is not required; however, the floor covering should be installed in a climate controlled environment with an ambient temperature range between 55°F - 85°F (13°C-29°C) or average temperature of 70°F (21.1°C).
Installation B. CONCRETE SUBFLOORS NEW AND EXISTING CONCRETE SUBFLOORS SHOULD MEET THE GUIDELINES OF THE LATEST EDITION OF ACI 302 AND ASTM F 710, “STANDARD PRACTICE FOR PREPARING CONCRETE FLOORS TO RECEIVE RESILIENT FLOORING” AVAILABLE FROM THE AMERICAN SOCIETY FOR TESTING AND MATERIALS, 100 BARR HARBOR DRIVE, WEST CONSHOHOCKEN, PA 19428; 610-832-9585; HTTP://WWW.ASTM.ORG. 1.
Installation C. EXISTING FLOOR COVERINGS Flooring can be installed over most existing hard-surface floor coverings, provided that the existing floor surface is fully adhered, clean, flat, dry, structurally sound and free of deflection. Existing sheet vinyl floors should not be heavily cushioned and not exceed more than one layer in thickness. Soft underlayment and soft substrates will compromise the product's locking ability as well as diminish its indentation resistance.
Installation 4. Choose your starting wall 5. Place tongue side in the starting corner (work from left to right). 6. Use several spacers to maintain 1/4"expansion gap along the walls. 7. Lock the short ends together to complete your first row. Cut the planks as needed to fit the space. 8. Start your second row. With a cut-off that is more than 8" long or start with a new plank. 9. Connect the length side at a slight angle, engage the long side and rotate down. 10. Continue installing the row 11.
Installation COMPLETION 1. Protect all exposed edges of the flooring by installing wall moulding and/or transition strips. Make sure that no plank will be secured in any way to the sub floor. 2. For wet areas such as bathrooms caulk the perimeter of the floor with a silicone caulk. 3. Protect the finished flooring from exposure to direct sunlight to reduce fading and thermal expansion. 4. Cutting resilient product into a fine point may lead to delamination.
FREQUENTLY ASKED QUESTIONS 1. Is underlayment required? Underlayment is recommended, but not required. We suggest using SMARTCORE Soft & Sound (Item #1191177 Model #LX50100001), which is also available at Lowe's. 2. Is a moisture barrier required? No, a moisture barrier is not required but is recommended when installing over a concrete subfloor. It is optional over a wood subfloor. 3.
PROJECT PLANNER Follow the steps below to calculate out the total number of cartons of Matrix flooring you will need for your project. 1. 2. First, measure the length and width of your space (A,B). A B length (ft) width (ft) Next, multiply the length (A) by the width (B) of your space to determine the estimated square footage (C). A x length (ft) 3. = width (ft) C estimated square footage Next, multiply your estimated square footage (C) by 1.