Instructions / Assembly

05-20DT13_0BPage 7
6. SECURE BASE FEET:
Slide leg pipe over over the base feet, line up the holes
in the pipe with the holes in the feet and secure with the
hardware indicated in Detail G.
Secure
with bolt
and nut
DETAIL G
10114
01010
MIDDLE
LEGS
7. PROPERLY ANCHOR THE FRAME
A. Anchors must be placed inside shelter at the corners of the shelter.
B. Insert a ¾" pipe or steel rod, through the eyelet of the auger and screw the anchor into the ground until the
eyelet is sticking out of the ground by 1-2" so it can be anchored to the legs.
If ground is too hard, dig a hole with a shovel or post hole tool. Optional: Fill with cement.
C. Wrap cable provided through the eyelet of the anchor and around the frame as shown below. Secure
the cable with the clamps provided.
5. INSTALL TOP RAIL:
Place the rst top rail under each end rib and secure it with a bolt as shown in Detail F. The same cross rail
should lay on top of the all middle ribs. Secure the rails to the frame with the hardware indicated in Detail F.
The top rail attached to the last rib will be installed under the pipe.
End Rib Anchors
NOTE:
15" Augers are for temporary use only!
We recommend 30" Augers be used,
4 minimum for use in a permanent installation.
WARNING:
Serious injury to persons or property could result if
cover is installed and shelter is not anchored and is
left unattended. Shelter must be securely anchored.
DETAIL F
802630
10210
Install the Top Rail
OVER all Middle Rib(s)
UNDER First and Last Ribs
02030
02031