Shenchen Precision Pump Manual of AMC Series Pump Head Baoding Shenchen Precision Pump Co.,Ltd.
Note: Please read the manual carefully before operating the product. Warning: Tubing may have cracks due to wear, which results in overflow of fluid from the tubing. In that time human body and instruments may be harmed. So, users must check frequently and change the tubing in time. Please stop pump head rotating when replacing the tube or changing the tube position, otherwise it may cause fingers or clothes got caught.
Catalogue 1. Product Introduction ............................................................................. - 1 2. Pump Head Instruction ......................................................................... - 1 3. Dimension Drawing .............................................................................. - 3 4. Pump Head Technical Specification ..................................................... - 4 5. Function Instruction ......................................................................
Shenchen Pump AMC Series 1. Product Introduction AMC series pump head has flexible positioning mechanism, where users can install and remove the cartridge easily. Flexible pressure tube design to extend the service life of the tube. Stepless adjustment of pressure tube gap to improve the transmission accuracy between channels. 304 stainless steel roller assembly, two types of roller structures: 6 rollers and 10 rollers.
Shenchen Pump AMC Series hexagon socket flat head screws(M4) to fix the pump head. The mounting holes is on the back board. Fasten the screws with a hexagon spanner. 2.2 Tubing Installation 1. Pressing elastic locking arm mechanism to open cartridge. 4. Pull the lever to fix the cartridge on the pump head. 2. After the cartridge take off, install tubing, two adjacent tube clamps determine a working position. 3. Install the cartridge to the pump head, make it into the working position. 5.
Shenchen Pump AMC Series 3. Dimension Drawing Unit: (mm) Note: 1. Increase the thickness of one cartridge for each additional channel. 2. The number after AMC indicates the number of channels Model type L AMC1 43.7 AMC2 53.9 AMC3 64.1 AMC4 74.3 AMC5 84.5 AMC6 94.7 AMC8 115.1 AMC10 135.5 AMC12 155.
Shenchen Pump AMC Series 4. Pump Head Technical Specification 4.1 Pump Head Technical Specification Pump head AMC1 AMC2 AMC3 AMC4 AMC5 AMC6 AMC8 AMC10 AMC12 Channel 1 2 3 4 5 6 8 10 12 Material of POM/PPS cartridge Material of 304 stainless steel roller Rollers 6 rollers, 8 rollers, 10 rollers Tube size Speed Pump head with 10 Pump head with 6 Tubing pressure Mpa range rollers Reference rollers Reference Intermittent flow rate(ml/min) flow rate(ml/min) 1×1 0.0050-7.
Shenchen Pump AMC Series 4.2 Flow Rate Chart 4.2.1 AMC1, AMC2, AMC3, AMC4, AMC5, AMC6, AMC8, AMC10, AMC12 (6 rollers) flow rate chart. 4.2.2 AMC1, AMC2, AMC3, AMC4, AMC5, AMC6, AMC8, AMC10, AMC12 (10 rollers) flow rate chart.
Shenchen Pump AMC Series 5. Function Instruction Adjustment function of pressure tubing gap Adjust the knob to adjust the pressure tubing gap, in this way you can change the pump head and tubing outlet pressure and flow rate. The pressure tubing gap is stepless adjustment, any position within the adjustment range can be used normally. Pump head pressure standard: 1) If the pump head will be used for 2*1 silicone tubing, the pressure is 0.2± 0.03Mpa.
Shenchen Pump AMC Series pressure is reduced, the flow rate become higher. Note: The lower the knob, the greater the outlet pressure of the pump head tubing, the faster the tubing wears, and the shorter the tubing life. Therefore, it is not recommended to adjust the knob too low. Note: 1. The knob is lower, the outlet pressure on pump head tubing is greater. The faster the tube will wear, and the shorter the tube life will be. So it is not recommended to set the knob too low. 2.
Shenchen Pump AMC Series wearing of the tubing, reduce the useful life of tubing and lead the rollers to damage in earlier. Before the peristaltic pump start running, check the tubing carefully each time to see if it is damaged. If the pump head accidentally is exposed to water, use a soft to wipe dry to prevent damage to the pump head. After replacing the tube, fluid, or any connecting tube, the pump must be re-calibrated.
MADE IN CHINA Baoding Shenchen Precision Pump Co., Ltd. Address:No.103,Building 2, Zhidian Industrial Park, FuXing East Road 999, Baoding, China. Tel: 0086- 312- 5958380 Fax: 0086-312- 6780636 Website: www.good-pump.com Email: info@good-pump.