User's Manual

User Manual
- 16 -
9. Booster Installation
9.1. Installation requirement
9.1.1. Installation Location Requirement
1) The Booster shall be installed indoor in a cool, dry and ventilated room without erosive gas or smoke, or a
cool and ventilated wall to ensure excellent heat dissipation
2) Installation height should be easy for RF cable wiring, heat dissipation, security and maintenance.
3) Have a set of independent and stable power supply.
9.1.2. Power requirement
Generally it is AC power supply, and the requirement of AC is 100~264VAC / 50±5Hz
9.2. Installation Steps
9.2.1. Installation schemes
The booster shall be installed in indoor areas only
1) Connect the power supply and the cables properly to the Booster ports
2) Check again to make sure the Booster is installed firmly and Booster alarm LED must stay green.
9.2.2. Boosters ports description
1) Outdoor port: connected with the donor antenna by cable
2) Indoor port: connected with server antenna directly or by cable
3) DC IN: connected with power supply.
9.2.3. Accessories selection
Please pay attention to the two points of “frequency” and “impedance” during the selection of the accessories.
All accessories shall support the Booster’s frequencies from feeder line, antenna and splitter to combiners
etc. For example, the Booster’s frequency is GSM900, so all the accessories must support the GSM900
frequency. And the Booster’s impedance is 50ohm, so the accessories shall all be 50ohm. To use any other