User Manual

Table Of Contents
Shenzhen Lean Kiosk Systems Co., Ltd
Contact: Jesmine Zhu;Tel: +86-17796361726 ; E-mail: jesmine@lien.cn ; Website: www.lkskiosk.com / www.lien.cn;
6 Add: Fu'an Industrial Area, Dayang Road, Fuyong Town, Baoan District, Shenzhen, Guangdong Province, China.
Stock Code
:
870885
voltage"; The power cord and network cable will go through from the bottom /base of the kiosk then enter
into the kiosk cabinet, and the ground installation platform should be pre-set the entrance hole for the
cables in advance.
Drainage System: Since the air conditioner and dehumidifier inside the kiosk will discharge a small
amount of water from the bottom during the operation, the ground installation platform for the kiosk must be
designed and reserved smooth drainage holes in advance.
Mounting Instructions for the Kiosk Base
Pay-on-Foot Kiosk will be installed on the street for use, and it should be installed on solid and reliable
concrete ground. The base with the power cord through must have reliable insulation and waterproof
treatment, the drainage hole under the base must be kept free for a long time and not easy to plug; If you
have any question during the installation, please contact LKS after-sales technical staff.
WarningSince the onsite construction and installation of the kiosks involves drilling, grooving, wiring,
high-voltage cable wiring, the construction personnel must have professional electrician certificate and
operate in strict accordance with the "electrical safety technical operation procedures". Also, they need to do
personal safety protection measures before starting to construct and install the kiosks.