Instruction manual

7. Hardware Validation
7-22
RF-20A/20Axs
5
Remove the flow cell unit from the instrument.
Check that there are no air bubbles in the cell.
6
Fit the flow cell to the instrument, then close the
front panel and the key panel.
Fig. 7.2
7
Carry out the inspection while pumping the water
with the pump (flow rate: 1 mL/min).
Lens ASSY
Cell housing
screw
Flow cell Excitation inlet