Instruction manual

8. Maintenance
8-46
RF-20A/20Axs
If there is an abnormality:
The screen to the right appears.
^ "6.2 Dealing with Error Messages" P.6-5
13
Press twice.
The initial screen is redisplayed.
NOTE
After wavelength calibration has finished, be sure to
remove the low-pressure Hg (mercury) lamp and fit the
Xenon lamp.
After the wavelength accuracy inspection, perform the operation below.
When neither a system controller nor LCsolution is used:
1
Turn the power to the instrument OFF.
2
Remove the low-pressure Hg (mercury) lamp, and fit the Xenon lamp as it was originally fitted.
When the system controller is connected:
1
Turn the power to the instrument and the system controller OFF.
2
Remove the low-pressure Hg (mercury) lamp and fit the Xenon lamp as it was originally fitted.
3
Turn the power to the instrument ON and set [0] for [LOCAL] in the system settings group.
4
Restart the system controller.
WAVE CALIB
CHECK NG1