Instruction manual

9.1 Installation
9-13
RF-20A/20Axs
9
9.1.5 Plumbing
The necessary plumbing is as follows:
Fig. 9.15
!CAUTION
Before plumbing, turn OFF the power supply to all the components and unplug them.
For plumbing, use the appropriate parts listed in "1.3 Component Parts".
Connect only the tubing described in the instructions.
Otherwise, injury or equipment failure may result.
Plumbing of the cell inlet tube: Plumbing to be the flow line for the mobile phase from the column
outlet to the instrument
Plumbing of the cell outlet tube: Plumbing for draining solution on which detection has been completed
Plumbing of tubing for leakages: If leaks occur in any of the units in a stack, this tubing directs it down
to the lowest unit in the stack, and from there to a waste container.
Securing the tubing for
plumbing: P. 9- 17
Manual injector
Column
Plumbing the cell
inlet tube: P.9-14
Waste container
preparation:
P. 9 - 1 6 and P.9-17
Plumbing the leakage
drain tubing: P.9-17
Plumbing the
cell outlet tube:
P. 9 - 16