Instruction manual
9.1 Installation
9-13
RF-20A/20Axs
9
9.1.5 Plumbing
The necessary plumbing is as follows:
Fig. 9.15
!CAUTION
• Before plumbing, turn OFF the power supply to all the components and unplug them.
• For plumbing, use the appropriate parts listed in "1.3 Component Parts".
• Connect only the tubing described in the instructions.
Otherwise, injury or equipment failure may result.
• Plumbing of the cell inlet tube: Plumbing to be the flow line for the mobile phase from the column
outlet to the instrument
• Plumbing of the cell outlet tube: Plumbing for draining solution on which detection has been completed
• Plumbing of tubing for leakages: If leaks occur in any of the units in a stack, this tubing directs it down
to the lowest unit in the stack, and from there to a waste container.
Securing the tubing for
plumbing: P. 9- 17
Manual injector
Column
Plumbing the cell
inlet tube: P.9-14
Waste container
preparation:
P. 9 - 1 6 and P.9-17
Plumbing the leakage
drain tubing: P.9-17
Plumbing the
cell outlet tube:
P. 9 - 16