Instruction manual

9. Technical Information
9-16
RF-20A/20Axs
Plumbing the Cell Outlet Tube
1
Fit a male nut PEEK onto one of the ends of the
tubing for plumbing provided (2 m).
2
Screw the male nut PEEK on the tubing for
plumbing onto the coupling 1.6-0.8C.
Fig. 9.19
3
Place the other end of the tubing for plumbing
inside the waste container.
NOTE
To ensure a smooth flow of liquid, put the tubing into
the bottle with its end pointing downward.
The tubing for plumbing at the cell outlet side functions
to apply a back pressure to the flow cell to prevent the
generation of air bubble and should therefore be used
with its uncut length of 2 m.
(A guide for flow rate: max. 1.5 mL/min)
The resisting pressure of the flow cell is 2 MPa. If the
flow rate is large, shorten the length of the tubing for
plumbing to bring the pressure below 2 MPa.
Fig. 9.20
Male nut,
PEEK
Tubing for
plumbing
Outlet coupling
1.6-0.8C
Tubing for
plumbing
Waste
container
Outlet coupling
1.6-0.8C