Instruction manual

21
4. Test Run
Make sure all the pipe joints have been screwed tightly, then clean the pipes and verify
the vacuum.
Remove the valve core copper caps of the high pressure valve and the low pressure
valve.
Remove copper cap of refrigerant-adding valve, measure the vacuum with the vacuum
pump (value should be less than 10Pa)
Close the copper cap of refrigerant-adding valve.
Unscrew the high pressure valve and low pressure valve.
Use the leakage detector or soapy water to check the system pipe joint and valve cap for
leakage.
If there is no leakage, screw tightly the copper caps of valve cores
.
3-5 Installation of the exterior draining pipe
Insert the drainage pipe into the hole of the base, connect an extending pipe to drain the
water.
Base hole of the outdoor unit catchment trough
4-1 Pipe-cleaning and vacuum verification
4-2 Test Run Procedure
Before testing, please check all the connecting wires and pipes carefully to see if they
are correctly connected, verify if the stop valve is completely opened or closed, and if
the air conditioner has been grounded correctly.
Connect the air conditioner system to the power source, a “Du” sound emitted by the
indoor buzzer should be heard.
Turn the air conditioner ON with the remote control.
Please choose the “heating” mode and set temperature at 25
0
C to check the heating
function. Please choose the “cooling” mode, set temperature at 16
0
C to check the
cooling function