Datasheet

INSTALLATION
LOCATION: Locate pump at deepest position in the bilge. Keep away from high heat source; engine, etc.
MOUNTING: Mount quick-disconnect bracket to hull or pad with stainless steel screws. Mount switch if
equipped. Do not drive screws through hull! TUBING: Route smooth I.D. discharge tubing to a thru-hull
fitting well above the water line. AVOID AIRLOCK & MAXIMIZE PERFORMANCE: Avoid any sagging or
loops in the tubing. Tubing must go up from pump to thru-hull.
ELECTRICAL
Use 16GA wire for all circuits. If installation is over 20 feet, use 14GA wire. Brown pump wire must be
hooked to positive power for maximum flow. Wire is designed to prevent corrosion. PANEL SWITCH:
Attach all wires to UL Marine approved duty switch with auto-off-manual, rated at or above 10 amps.
FUSE: Install a fuse per pump label specifications . CONNECTIONS: Wire connections should be made
above highest possible water level. Seal wire connections to prevent corrosion and electrolysis.
OPERATION
DO NOT RUN PUMP DRY. ALWAYS TEST PUMP AND SWITCH BEFORE LEAVING DOCK.
BILGE PUMP FEATURES
Quick-disconnect base plate for easy installation.
Nylon Impeller.
Submersible.
3 ft. tinned power leads to insure operation in the wettest conditions.
Water cooled motor to insure long life.
Easy transom mount base plate.
Manual
Automatic
Panel Switch
Brown
Brown
&
White
Brown
Black
Black
To
Switch
To
Pump
Typical Electrical Installation with Pump and Switch
Make all electrical
connections with
waterproof
connectors.
Ground
--
+
12VDC
Battery
Fuse
MANUAL MODE: When brown wire from switch is not hooked up, the pump float switch is bypassed. To
turn pump on, turn switch on. If pump does not turn on, turn switch off, check power, fuses, connections,
wires. Retry. If pump does not turn on, check pump motor. When the water level is above the float switch,
the pump will automatically start. If the float becomes jammed with debris, the pump will NOT STOP
running. Turn the pump switch to the OFF position. Remove the debris. Reset switch to the automatic or
manual ON position. Test. SWITCH TEST: Turn power ON to pump switch. Use a quarter or flat head.
911-758 Rev D 12/08 ECO #: 16135 Page 1 of 2
Model 355 Installation Instructions

Summary of content (2 pages)