User's Manual
Table Of Contents
- Table of Contents
- SITRANS LR250 Overview
- Specifications
- Installation
- Wiring
- Operating via the handheld programmer
- Operating via SIMATIC PDM
- Functions in SIMATIC PDM
- Quick Start Wizard via SIMATIC PDM
- Changing parameter settings using SIMATIC PDM
- Parameters accessed via pull-down menus
- Operating via AMS Device Manager
- Functions in AMS Device Manager
- Features of AMS Device Manager
- Device Description (DD)
- Configuring a new device
- Startup
- Pull-down menu access
- Device configuration
- Quick Start Wizard via AMS Device Manager
- Maintenance and Diagnostics
- Remaining Device Lifetime [see Remaining Device Lifetime (4.2.) on page 99]
- Remaining Sensor Lifetime [see Remaining Sensor Lifetime (4.3.) on page 102]
- Service Schedule [see Service Schedule (4.4.) on page 105]
- Calibration Schedule [see Calibration Schedule (4.5.) on page 108]
- Electronic Temperature
- Wear (see Wear on page 56)
- Communication
- Security
- Device Diagnostics
- AMS Menu Structure
- Functions in AMS Device Manager
- Parameter Reference
- 1. Quick Start
- 2. Setup
- 3. Diagnostics
- 4. Service
- 5. Communication
- 6. Security
- 7. Language
- Appendix A: Alphabetical Parameter List
- Appendix B: Troubleshooting
- Appendix C: Maintenance
- Appendix D: Technical Reference
- Principles of Operation
- Echo Processing
- Analog Output
- Maximum Process Temperature Chart
- Process Pressure/Temperature derating curves
- Loop power
- Appendix E: Application Examples
- Appendix F: HART Communications
- Appendix G: ATEX Certificates
- Appendix H: Firmware Revision History
- Glossary
- Index
- LCD menu structure
Page 110 SITRANS LR250 (HART) – INSTRUCTION MANUAL 7ML19985JE03
mmmmm
Parameters
4.5.2. Time since Last Calibration
Time elapsed since last calibration. Can be reset to zero after performing a
calibration.
To reset to zero:
• In SIMATIC PDM, open the menu Device – Maintenance, click on the
Calibration Schedule tab, and click on Calibration Performed to restart the
timer and clear any fault messages.
• Via the handheld programmer, manually reset Time since Last Calibration
(4.5.2.) to zero.
4.5.3. Time until Next Calibration
Read only. Calibration Interval (4.5.1.) less Time since Last Calibration (4.5.2.).
4.5.4. Reminder Activation
Allows you to enable a maintenance reminder
.
a) First set the values in Reminder 1 (Required) (4.3.5.)/Reminder 2
(Demanded) (4.5.6.).
b) Select the desired Reminder Activation option.
4.5.5. Reminder 1 (Required)
If Time until Next Calibration (4.5.3.) is equal to or less than this value, the device
generates a Maintenance Required reminder.
a) Modify values as required.
b) Set Reminder Activation (4.5.4.) to the desired option.
Note: To modify this parameter via SIMATIC PDM it must be accessed via the
pull-down menu Device – Maintenance.
Values
* Timer OFF
ON - no reminders checked
ON - Reminder 1 (Maintenance Required) checked
ON - Reminders 1 and 2 checked
ON - Reminder 2 (Maintenance Demanded) checked
Values
Range: 0 to 20 years
Default: 0.164 years