User's Manual
Table Of Contents
- RuggedMAX™ WiN7200 Small Form Factor Base Station
- Table of Contents
- FCC Statement And Cautions
- 1. About This Guide
- 2. Introduction
- 3. Site and Installation Requirements
- 4. Installation Procedures
- 4.1. Pre-Installation Safety Instructions
- 4.2. Package Components and Unpacking
- 4.3. Required Tools and Materials
- 4.4. Installing the Base Station
- 4.5. Hazardous Location Installation
- 5. Setup
- 6. Troubleshooting
- Appendix A. List of Acronyms
- Appendix B. WiN7200 Small Form Factor Base Station Specifications
- Appendix C. IDU to ODU Cable Specifications
- Appendix D. Console Connector Specifications
- Appendix E. WiN7200 Small Form Factor Base Station Base Station Mechanical Drawing
- Appendix F. Warranty
4. Installation Procedures
RuggedMAX™ 19 Installation Guide Rev 1.0
Figure 4.5. Inserting the cable into the plug
6. Slide the plug housing up the cable and align the housing with the modular plug. Insert the
modular plug into the plug housing and align the latch with the latch slot. Depress the latch
(1) and insert the plug into the plug housing (2).
Figure 4.6. Inserting the plug into the plug housing
Press the modular plug into the plug housing until it bottoms out.
7. While maintaining inward pressure on the plug, tighten the compression nut to 0.56Nm (5
inch-pounds).
Figure 4.7. Securing the plug housing
8. Secure the PoE cable to the CD/ETH connector on the base station.