User's Manual
Table Of Contents
- RuggedMAX™ WiN7200 Small Form Factor Base Station
- Table of Contents
- FCC Statement And Cautions
- 1. About This Guide
- 2. Introduction
- 3. Site and Installation Requirements
- 4. Installation Procedures
- 4.1. Pre-Installation Safety Instructions
- 4.2. Package Components and Unpacking
- 4.3. Required Tools and Materials
- 4.4. Installing the Base Station
- 4.5. Hazardous Location Installation
- 5. Setup
- 6. Troubleshooting
- Appendix A. List of Acronyms
- Appendix B. WiN7200 Small Form Factor Base Station Specifications
- Appendix C. IDU to ODU Cable Specifications
- Appendix D. Console Connector Specifications
- Appendix E. WiN7200 Small Form Factor Base Station Base Station Mechanical Drawing
- Appendix F. Warranty
4. Installation Procedures
RuggedMAX™ 27 Installation Guide Rev 1.0
1. Connect a DC cable between the PSU and PoE injector.
Figure 4.15. Connection Scheme
2. Connect a Category 5e cable between the PoE injector (Data+Power jack) and the pBST.
3. Connect a Category 5e cable between the Ethernet switch and the PoE injector (Data jack).
4. Connect the AC open-ended cable to the PSU.
Figure 4.16. Complete Class 1 Division 2 Installation Kit
Important:
The power supply AC cord should be 3 wires, 18 AWG minimum, with a length of less
than 4.5 m, and safety certified according to national rules.