User Manual

BACnet/IP networks
Designing BACnet/IP networks
4
A6V11159798_en--_03 33 | 71
Demand
New office building with room automation for 424 rooms over 4 floors as well as preparing the
appropriate primary plants.
Each floor is leased by another tenant and has its own occupancy and use, i.e. the room operating
mode as well as associated room setpoints, lighting per floor with central operation, and emergency
function.
Blinds control for each facade including protection, service, and emergency function.
Central weather station, demand-controlled control of primary plants.
Schedulers together with a calendar for room operating modes and lighting for each floor, superposed
functions on a monitoring device.
Primary plants for air handling, heat generation and distribution as well as central distribution of
refrigeration in an equipment room.
Primary plants and general: 5 PXC100-E.D und 5 PXC00-E.D
Desigo room automation: 402 PXC3.E…/DXR2
Visualization, operating and monitoring Desigo CC
Monitoring network components via SNMP