User Manual

BACnet networks with MS/TP trunks
Application examples
5
A6V11159798_en--_03 51 | 71
5.4.1 Network for a small to mid-sized project
Example for planning and implementing a project.
Project Description
New office building with room automation for 136 rooms over 4 floors as well as preparing the
appropriate primary plants.
Each floor is leased by another tenant and has its own occupancy and use, i.e. the room operating
mode as well as associated room setpoints, lighting per floor with central operation, and emergency
function over all floors.
Blinds control for each facade, including protection, service, and emergency function over all floors, a
central weather station, demand-control of primary plants.
Schedulers together with a calendar for room operating modes and lighting for each floor, superposed
functions on a monitoring device.
Primary plants for air handling, heat generation and distribution as well as central distribution of
refrigeration on equipment rooms.
Primary plants and general: 5 PXC100-E.D und 1 PXC00-E.D
Desigo room automation stations: 120 DXR2.M and 1 DXR2.E18
Network infrastructure: Visualization and monitoring in the event of failure