User Manual

52 / 86
Siemens Desigo Room automation - Engineering, mounting and installation CM111043en_14
Smart Infrastructure MS/TP networks 2020-10-30
10 MS/TP networks
10.1 Network requirements
· The MS/TP network must be inside the building.
The cables must never leave the building.
· BACnet MS/TP networks for Desigo TRA can only be wired in line topology.
T-taps (T-junctions) are not allowed, except for stubs (max. 30 m).
Whereas HVAC functions are not time-critical, lighting and blinds require a visible
response within 0.25 s.
For response time reasons, and because the number of commandable group
objects is limited, DXR2.M... room automation stations with MS/TP communi-
cations are subject to the following restrictions:
Switches / pushbuttons and actuators for Lighting and blinds must operate on
KNX PL-Link, and they must be connected to the same DXR2.M.. .
No combination with PXC3 (via MS TP to IP router).
As a consequence, no combination with DALI lighting control via a PXC3.
Room-segment relations only allowed in the same MS/TP network.
Grouping of several room segments is only allowed for HVAC functions.
The maximum of 32 DXRs can be used as follows:
2 rooms with 16 segments each or 16 rooms with 2 segments each
or any intermediate values. Desigo V6.1: max. 64 DXR2.
If lighting and/or blinds are present, only one DXR2.M... room automation station
per room is allowed.
No central functions.
No KNX S-Mode device integration, only KNX PL-Link.
Connecting the room automation stations to a management station via an
MS/TP to IP router is admitted.
Topology
Restrictions for
DXR2.M...