Installation Instructions
Document No. 129-801 
Installation Instructions 
June 19, 2015 
Page 4 of 7  Siemens Industry, Inc. 
Actuator/Valve Stem Connection, Continued 
2.  Crank down until you hear the stem connector 
snap into place. See Figure 10. 
Figure 10. 
3.  Return the crank arm to its storage location. 
CAUTION:   
Do not rotate the actuator on the valve once the 
actuator and valve stem are connected, and/or 
the anti-rotation device is connected to the valve 
stem. Doing so will inadvertently adjust the flow 
setting of the valve. 
DIP Switches 
Factory setting 
1)  Tolerance: + 1 second 
2)  Factory setting 
LED Status 
Wiring Diagrams 
0 to 10V/4 to 20 mA 
G  System Potential 
G0  System Neutral 
G1  Y = 0 Vdc/4 mA: Actuator fully extended 
  (increasing control signal retracts actuator  
  stem)  
G2  Y = 0 Vdc/4 mA: Actuator fully retracted, 
  (increasing control signal extends actuator  
  stem) 
Yu/Yi  Control Signal 0 to 10V/4 to 20 mA 
U  Position Indication 
3-position 
G  System Potential 
G0  System Neutral 
G1  Control signal: Actuator stem extends 
G2  Control signal: Actuator stem retracts 
The installation is now complete. 







