Installation Instructions

Installation Instructions
Document No. 129-489
August 13, 2018
Liquid Immersion Temperature Sensors
Component Kit
Item Number 129-489, Rev. CA Page 1 of 2
Product Description
The Component Kit is designed for installation into a
2-1/2-inch, 4-inch, or 6-inch well (well not included).
The sensor in the kit provides a temperature input to
a controller.
Contents
Description
Quantity
Pulling elbow
1
Sensor
1
Sensor support tubes
3
Spring
1
Spring retaining washer
1
Wire nuts
2
Product Numbers
AQE2012 Pt 1000, (385)
AQE2020 Nickel 1K, Siemens
AQE2030 NTC 10K Type 2
AQE2032 NTC 10K Type 3
536-777-RK NTC100KΩ NTC
544-577-RK Pt 1000, (375)
Required Tools
Medium flat-blade screwdriver
1-1/4-inch open end wrench or equivalent
adjustable wrench
Pliers or channel-locks
Wire stripper
Dow Corning #340 (or similar) thermal
compound
Expected Installation Time
28 minutes
Prerequisites
Read these instructions before beginning.
The immersion well(s) must be previously
installed and field wiring pulled to a termination
point near the well.
Installation
Installing a sensor assembly into a well
1. Disconnect one of the leads of the field wiring
from the termination board or block at the
controller.
2. Uncoil the sensor leads and remove the plug
from the well.
3. Select the appropriate length sensor support
tube for the well being serviced.
4. Assemble the spring and spring retaining washer
onto the sensor support tube and pass the lead
wires of the sensor through the tube. See
Figure 1.
Figure 1. Sensor Assembly.
5. Coat the sensor with thermal compound and
insert the assembly into the well.
6. Install the pulling elbow:
a. Remove the cover and gasket from the
pulling elbow.
b. Wrap the treads of the pulling elbow with
Teflon
®
tape or equivalent.
c. Thread the sensor leads through the male
end of the pulling elbow and out through the
cover opening.
d. Screw the pulling elbow into the well.

Summary of content (2 pages)