Installation Instructions
Installation Instructions
Document No. 550-309
Rev. 1, July, 2001
CE Compliant Room Pressurization Controller —
Electronic Output
Page 1 of 8
Product Description
These instructions explain how to field install or
replace a CE Compliant Room Pressurization
Controller (RPC) — Electronic Output with or without
Autozero Modules.
Shipping carton includes a controller assembly
(controller board and cover), a mounting rail, Autozero
Modules with brackets (optional), and two self-tapping
screws.
For CE compliance, ferrite filter(s) and an alternate
room sensor cable must be used (see Product
Numbers).
NOTE: Keep the controller assembly in its static-
proof bag until installation.
Product Numbers
Product Description
550-516 CE Compliant Room Pressurization
Controller — Electronic Output
550-517 CE Compliant Room Pressurization
Controller — Electronic Output with Autozero
Modules
588-100A 25-ft (7.6-m)
588-100B 50-ft (15.2-m)
588-100C
2-RJ11 room
temperature
sensor cable
100-ft (30.48-m)
550-705 clamp-on ferrite filter 10 pack
Caution Notation
CAUTION:
Equipment damage or loss of
data may occur if the user
does not follow procedure as
specified.
Required Tools
• Electro-Static Discharge (ESD) wrist strap
• Small flat-blade screwdriver
• Medium flat-blade screwdriver
• Medium-duty electric drill
• 1/4-inch (6.35 mm) hex nut bit
• Portable Operator’s Terminal with Controller
Interface Software (CIS) Rev. 2.0 or higher
(controller replacement only)
Additional tools needed if not using self-tapping
option:
• 1/4-inch (6.35 mm) hex nut driver
• 1/8-inch (3 mm) bit
Prerequisites
• Room temperature sensor installed (optional).
• Air velocity sensors installed in ducts
• 24 Vac Class 2 power source
• Supply power to the unit is OFF
• Autozero Modules with brackets are on hand
(optional)
• If required, controller enclosure installed
Expected Installation Time
New controller installation 10 min.
Replacement with removable terminal
blocks
6 min.
Replacement without removable
terminal blocks
16 min.
NOTE: You may require additional time for
database work at the field panel.