Installation Instructions

Document No. 550-154
Installation Instructions
October 26, 2016
Page 2 of 7 Siemens Industry, Inc.
Warning/Caution Notation
WARNING
Personal injury/loss of life may
occur if you do not follow the
procedures as specified.
CAUTION
Equipment damage or loss of
data may occur if you do not
follow the procedures as
specified.
AVERTISSMENT
Risques de blessures graves
ou mortelles, si vous ne suivez
pas les procédures indiquées.
ATTENTION
Risques de dommages ou de
pertes de données, si vous ne
suivez pas les procédures
indiquées.
Accessories
Parts for Smoke Control Compliance
Smoke Control Listed Small
Equipment Controller Enclosure (Short
board controllers only)
540-155K
Smoke Control Listed Large
Equipment Controller Enclosure (Long
board and ATEC controllers)
550-002K
UL Listed Class 2 transformer with
120/240/277/480 Vac 50/60 HZ 0.5A
primary with hub and 24 Vac 96VA
secondary w/ hub and circuit breaker
TR100VA004
NOTE:
For smoke control application,
primary rating is only 120V/60 Hz.
Expected Installation Time
New controller installation
10 Minutes
Replacement (old controller has
removable terminal blocks)
6 Minutes
Replacement (old controller does not
have removable terminal blocks)
16 Minutes
NOTE:
You may require additional time for
database work at the field panel.
Required Tools and Equipment
Small flat-blade screwdriver (1/8-inch blade
width)
Cabling and connectors
Cordless drill/driver set
ESD wrist strap
Prerequisites
Wiring conforms to NEC and local codes and
regulations. For further information see the
Wiring Guidelines Manual
(125-3002).
Room temperature sensor installed (optional).
24 Vac Class 2 power available.
Supply power to the unit is OFF.
Any application specific hardware or devices
installed.