SIMOREG DC Master Product Manual

7-20 Siemens Energy & Automation
SIMOREG DC Master Base Drive Panel Operating Instructions
7.4 Description of Power/Control Terminals
WARNING
The Base Drive Panel might sustain serious or irreparable damage if connected incorrectly.
The power cables and/or busbars must be secured mechanically outside the converter in order
to provide proper stress relief at the terminals.
Base Drive Panels are complete drive assemblies that include all semiconductor type fuses, main contactor, and
a control transformer, ready to be connected and operated. All external connections to Base Drive Panels,
including power connections are made with compression type terminals on the drive.
The user is responsible for installation of the motor, SIMOREG Base Drive Panel, transformer, and other devices
in accordance with the National Electric Code and other applicable local codes that cover such items as wire
size, protective grounding, disconnects, and short circuit protection. Depending on the rating, base drives can
accommodate a range of cable sizes as indicated below.
Base Drive Panel Power Connections 15 to 100 Amp
RATING CABLE RANGE RECOMMENDED TORQUE
15 AMP
L1, L2, L3, A1, A2, GND
#12 to #4 AWG 1.2 Nm (11 IN-LBS)
30 AMP
L1, L2, L3, A1, A2, GND
#12 to #4 AWG 1.2 Nm (11 IN-LBS)
60 AMP
L1, L2, L3, A1, A2, GND
#10 to #1 AWG 3 Nm (27 IN-LBS)
100 AMP
L1, L2, L3, A1, A2, GND
#10 to #1 AWG 3 Nm (27 IN-LBS)
Base Drive Panel Power Connections 140 to 255 Amp
RATING CABLE RANGE RECOMMENDED TORQUE
140 AMP
L1, L2, L3, A1, A2
2 CABLES PER CONNECTION
#6 AWG to 250 MCM
31 Nm (275 IN-LBS)
210 AMP
L1, L2, L3, A1, A2
2 CABLES PER CONNECTION
#6 AWG to 250 MCM
31 Nm (275 IN-LBS)
255AMP
L1, L2, L3, A1, A2
2 CABLES PER CONNECTION
#6 AWG to 250 MCM
31 Nm (275 IN-LBS)
Ground Terminal
140, 210, 255 Amp
#8 to #2 AWG 5 Nm (45 IN-LBS)