Installation Instructions
Document Number 540-1033
Installation Instructions
October 26, 2016
Page 2 of 6 Siemens Industry, Inc.
Figure 1. RPC without Autozero Modules.
3. Place the ESD wrist strap on your wrist and
attach it to a good earth ground.
4. Carefully remove the controller assembly from
the anti-static bag. Center it over the mounting
rail and snap it securely into place.
5. Connect the Floor Level Nework (FLN), see
Figure 4.
CAUTION:
Do not connect an earth ground to the
Shield (S) terminal.
6. Connect the point wiring for the appropriate
application. See Figure 7. See Table 1 for
application descriptions.
CAUTION:
The Controller’s Digital Outputs (DOs)
control 24 Vac loads only. The maximum
rating is 12 VA for each DO. Use an
interposing 220V
4-relay module (P/N 540-147) for any of the
following:
VA requirements higher than
maximum.
110 or 220 Vac.
DC power.
Separate transformers used to
power the load.
NOTES: 1. Each DO provides a Normally
Open (NO) and a Common (C)
terminal. Terminate both
connections of a 24 Vac load
directly to the controller board.
Actuators use two DOs and
require three connections.
2. The 24 Vac “H” terminal is
switched through a TRIAC to the
NO terminations when the
associated DO is energized.
7. If using Autozero Modules, use the installation
instructions included.
8. After the Autozero Modules are installed,
connect the Autozero Module wires to the
controller at DO7.
9. If using a pressure mode switch, follow the
Installation Instructions (540-719) included with
the switch.
10. After the pressure mode switch is installed, wire
the switch to DO8 and AI3 as described in the
instructions.
11. Plug the Room Temperature Sensor cable into
the RTS port on the controller board (Figure 1).
12. Connect the power trunk as shown in Figure 5.
DO NOT apply power to the controller.