User Guide

Table Of Contents
Command Syntax
Siemens Building Technologies, Inc. 3-41
EMOFF (Emergency, Off status)
Unitary pre-APOGEE APOGEE BACnet
Syntax
EMOFF(pt1,...,pt16)
pt1
through
pt16
Point name to be set to OFF status with emergency priority.
This parameter can be a LDI, LDO, LFSSL, LFSSP,
LOOAL, LOOAP, L2SL, or L2SP point.
Use
Changes the operational status of the specified points to OFF with
emergency priority.
A maximum of 16 points can be changed with one EMOFF
command.
See also
EMAUTO, EMFAST, EMON, EMSET, EMSLOW
APOGEE PPCL User’s Manual
3-42 Siemens Building Technologies, Inc.
EMON (Emergency, On status)
Unitary pre-APOGEE APOGEE BACnet
Syntax
EMON(pt1,...,pt16)
pt1
through
pt16
Point name to be set to ON status with emergency priority.
This parameter can be a LDI, LDO, L2SL, L2SP,
LOOAL, or LOOAP point.
Use
Changes the operational status of the specified points to ON with
emergency priority.
A maximum of 16 points can be changed with one EMON command.
See also
EMAUTO, EMFAST, EMOFF, EMSET, EMSLOW