User's Manual

Automation and Drives - SCE
T I A Training Document Page 41 of 64 Module
3. Generate a new project, select a path and assign a project name ( User projects
PID_Control OK)
Enter project
name
Cick 'OK'
Select storage
location (path)
Select 'User
Projects’
4. Insert the SIMATIC 300 station ( Insert Station SIMATIC 300 Station)
Click on 'SIMATIC 300
Station'
Preface Fundamentals Discontinuous Action Controllerr Controller Block (S)FB41 Setting the System Appendix
B3
Issued: 02/2008 Control Engineering with STEP 7