Installation Instructions

Chapter 4 - Power Cabling
UL Criteria for Cabling and Fusing
30 | 82
Siemens Industry, Inc.
Smart Infrastructure
Siemens BT300 HVAC Drive
Installation Instructions
DPD01148
2019-05-29
NOTES:
The factory-default switching frequencies (all frames) meet EMC requirements.
If the safety switch is connected, the EMC protection is continuous over the entire
cable installation.
NOTE:
The data detailed within Table Cable and Fuse Sizes for Siemens BT300 (FS4 to
FS9) applies to cases with one motor and one cable connection from the AC drive
to the motor. In other applications, consult the factory for more information.
PE conductor
and shield
PE conductors
Shield
9007.emf