Installation Instructions

Chapter 4 - Power Cabling
Cable Installation
35 | 82
Siemens Industry, Inc.
Smart Infrastructure
Siemens BT300 HVAC Drive
Installation Instructions
DPD01148
2019-05-29
4.
Insert the cable grommets (included in the delivery) in the openings of the cable
entry plate (included).
5.
Insert the cables - supply cable and motor cable - in the openings of the
cable entry plate.
Then cut the rubber grommets open to slide the cables through. Should the
grommets fold in while inserting the cable, just draw the cable back a bit to
straighten the grommets up.
Do not cut the grommet openings wider than what is necessary for the
cables you are using.
6.
Detach the cable clamps and the grounding clamps and then place the cable
entry plate with the cables in the groove on the drive frame. See the following
figures.