Installation Instructions

Chapter 4 - Power Cabling
Cable Installation
40 | 82
Siemens Industry, Inc.
Smart Infrastructure
Siemens BT300 HVAC Drive
Installation Instructions
DPD01148
2019-05-29
1.
Strip the motor and line voltage (mains) cables as outlined in the following figure
and table.
Frame
A1
B1
C1
D1
C2
D2
E
FS8
1.57 (40)
7.08 (180)
0.98 (25)
11.8 (300)
0.98 (25)
11.8 (300)
Leave as
short as
possible
FS9
1.57 (40)
7.08 (180)
0.98 (25)
11.8 (300)
0.98 (25)
11.8 (300)
2.
FS9 only: Remove the main cover of the drive.
9019.emf
D1
B1
C1
A1
D2
C2
E
Earth conductor
MAINS MOT OR
Earth conductor